The Cubes at French Lake
Dayton, MN
1,006,880 SF
Clayco has completed ten facilities for Save-A-Lot, nine distribution facilities and one facility expansion. These facilities include a five-zone refrigerated area, a dry goods area and office space. Constructed primarily using load-bearing concrete tilt-up walls with structural steel supports, the facility utilizes insulated concrete tilt-up panels in freezer and cooler areas.
The refrigerated zones includes minus 10° F and 0° F freezers, a 28° F meat cooler, and 36° F and 55° F coolers. The chilled area features 32-foot clear-height ceilings and 24 dock doors. Save-A-Lot’s 213,000-square-foot dry goods area has 28-foot clear-height ceilings and 38 dock doors. The 12,960 square feet of office space includes a conference room, break room, dispatch area, and facilities for drivers and warehouse personnel.